160,000 sq.ft Office Retrofit: A Multi-Disciplinary Decarbonisation Case Study
Southbank, London
2026
HollenPlus has been appointed to lead the integrated sustainability strategy for this £65m Southbank refurbishment.
Our role is to reposition a legacy 160,000 sq.ft asset into a best-in-class, ESG-compliant workplace, delivering a technical stack that goes far beyond standard regulatory requirements.
Technical Appointment & Deliverables:
BREEAM Assessment RFO 2014: Targeting a minimum ‘Excellent’ rating.
WELL Certification: A comprehensive health and wellbeing strategy for prime office space, targeting Gold / Platinum
MEES & Level 5 EPC: Advanced Dynamic Simulation Modelling (DSM) to secure a minimum EPC A.
Whole Life Carbon Assessment (WLCA): Aligned with RICS Professional Statement (2nd Edition) to quantify embodied and operational impacts.
TM54 Operational Energy Modelling: Closing the performance gap between design intent and actual utility use.
Strategic Statements: Delivery of the Circular Economy Statement (CES), Sustainability Feasibility Masterplan, and Energy/Sustainability Statements for planning.