HollenPlus was appointed to undertake a level 5 DSM EPC for a 450,000 sq.ft City of London tower.
This was a detailed project across 18 floors totalling 450,000 sq.ft. during a building wide refurbishment.
The project involved connection to a heat network, and HollenPlus was involved throughout the process of specifying the maximum carbon factors that would enable the achievement of our clients target EPC.
HollenPlus provided comprehensive advisory services and detailed support throughout the process, advising on cost-effective improvements that could be made to refurbishment specifications.